For Electrical Contractors

Update Estimates at the Pace of Design

From early budgets through construction closeout, keep cost accuracy as electrical systems evolve. Work with whatever information exists, whether that's detailed models, panel schedules, or fixture counts.

Start Conversation

Phase three. The budget is presented. The owner asks where the number came from. Nobody in the room can fully trace it.

Active Estimating is a Full-Cycle Cost Intelligence Platform

Built by construction practitioners with 29+ years of field experience.

We help electrical contractors maintain estimate accuracy through design evolution, whether you're providing early budgets for design-build pursuits or tracking scope changes through construction.

The Challenge

Electrical Scope is a Moving Target

Systems change constantly. Equipment specs evolve. Your original estimate is already outdated.

Early Budgets Without Design

Design-build and design-assist require cost input before electrical design exists. You need credible numbers from building type, square footage, and system assumptions.

Late Model Development

Electrical models are often the last to develop. Conduit routing and panel locations stay placeholder while architectural and structural are detailed. You can't wait for the model to bid.

Specification Changes

Equipment specs change throughout design. Different switchgear, different lighting fixtures, different controls. Each change ripples through your pricing.

Coordination Impacts

Your routing depends on everyone else. Ceiling changes, wall relocations, equipment moves all affect your pathways. Tracking what changed is a nightmare.

What You Get

Cost Intelligence Across the Project Lifecycle

From first budget through
construction closeout.

Early Budget Capability

Generate credible electrical budgets from building programs and system assumptions before detailed design begins. Support design-build pursuits and GMP negotiations.


Design Phase Tracking

As information develops, from fixture counts to panel schedules to model geometry, update estimates systematically. Know what's from design data versus what's assumed.


Scope Change Documentation

Document what changed, when, and why. Quantify impacts. Build change order evidence as design and coordination proceed.


A Note on Electrical Model Reality

Electrical models are often the least developed, especially early in design. Conduit routing may be placeholder. Panel locations may shift. Our approach doesn't require complete models. We work with fixture counts, panel schedules, equipment specs, and whatever geometric data exists. You always know what's quantified from design documents versus what's carried as assumptions.

By Delivery Method

Different Engagements,
Different Value

How you engage determines which capabilities matter most.

Design-Build / Design-Assist

You're providing cost input before detailed electrical design exists. Early budgets from building type, load assumptions, and system selections. Track as design develops against your original cost basis.

Primary AEConcept™ + AEConnect™
IPD / Target Value Delivery

Continuous collaboration requires continuous cost visibility. Real-time feedback on system options. Track target budget alignment through every iteration.

Primary AEConcept™ + AEConnect™ + AECalibration™
CM at Risk / GMP

GMP negotiations require early cost certainty. Lock in assumptions, track design evolution against your basis, document scope changes that affect your price.

Primary AEConcept™ + AEConnect™
Design-Bid-Build

Respond to addenda quickly. Track what changed between bid sets. When you win, document baseline scope for change order protection through construction.

Primary AEConnect™ + AECalibration™
Platform Modules

Full-Cycle Cost Intelligence

Click to learn more about each module.

Concept Phase

AEConcept™

high Value for Design-Build

Detailed electrical budgets from building programs before design exists. Support pursuits and GMP negotiations with defensible numbers.

Design Phase

AEConnect™

High Value for All Engagements

Update estimates systematically as design information develops. Track changes between iterations. Keep up with the pace of design.

Construction Phase

AECalibration™

Post-award scope tracking. RFI impact documentation. Change order support through construction.

Construction project

Ready to Keep Up with Design?

Tell us about your current process and project types. We'll show you where cost intelligence fits.

Start Conversation